ELSTER A1140 PDF

Camax stock and supply Elster A’s in either 5A Current Transformer Connection or A Direct Connection. This document is intended as a guide to help Suppliers of Elster Metering Systems Your Elster A Meter has been chosen by your Service Provider to . A Three-phase CT Meter available at MWA Technology. Speedy delivery from direct Rating. A, Elster three phase electricity CT meter, 5/10/ A.

Author: Vokazahn Faelkree
Country: Latvia
Language: English (Spanish)
Genre: Health and Food
Published (Last): 28 July 2012
Pages: 118
PDF File Size: 11.55 Mb
ePub File Size: 20.9 Mb
ISBN: 158-3-46987-685-7
Downloads: 63964
Price: Free* [*Free Regsitration Required]
Uploader: Maular

Scheme Manager Context Menu with the options shown opposite becomes available. Before installing a module or module peripheral equipment, read the Safety Warnings, Warnings, Precautions for handling electrostatic discharge sensitive eldter and EMC Guidelines below. The actual value of data can be viewed by placing the cursor on the plotted readings.

Up to days of 30 minute data can be stored for a single channel. Priority services are available to UK mainland residents only this might exclude certain areas in the north of Scotland.

The port operates at speeds of up to baud. Using the F1 Key Readings The A can elste programmed to record up to four values from any of the rising demand registers at the end of each integration period. Daylight Savings The meter has the facility to have a different switching program consisting of several switching times running on different days of the week.

elsted

A1140 Three-phase CT Meter

The Meter manager consists elstef three components. The Password is initially set to Elster. A2 Live Link Data will be read back from the meter Note: Probe with DTR disabled Probe with DTR enabled It is important to choose the correct probe for your installation, as optical communications will not be available if the wrong probe is selected. An event is detected if the meter runs in reverse for a period greater than 5 seconds. The register will then roll over to 0.

  CHECKMATE TACTICS GARRY KASPAROV PDF

Examples of displays and a full list of displays are given in Figures 7 and 8 respectively. Check that there is no movement or loose parts within the meter enclosure. In A meters the integration period used for the demand registers is the same as the load profile integration period.

This software is available from Elster Metering Systems and is described in M 3.

ELSTER A USER MANUAL Pdf Download.

Costs are calculated for certain countries at the checkout. Obviously it wouldn’t be very accurate when the output is very low but I could live with that. Optional Serial Data Port Fast data collection of cumulative registers, historical data and load profiling A using data stream mode System Connections 3 Element: Communications are provided via the optical IEC port and are supported by data stream mode, allowing fast reading of meter a11140.

A new file with the following format must be loaded. But as A110 said all it is giving me is the total energy generated.

For new connections refer to Section 8. It’s also convenient for me as I like to dabble with these things: In such cases delivery of your equipment may be subject to a minor delay. Page 97 Probe with DTR disabled Probe with DTR enabled It is important to choose the correct probe for your installation, as optical communications will not be available if the wrong probe is selected.

  AN INTRODUCTION TO COSMOLOGY NARLIKAR PDF

A way D type way D type way D type 5: Forum has moved to: S1140 strength may be tested by using the monitor on a mobile telephone providing the mobile uses the same service provider as aa1140 SIM in the GSM.

Elster A1140 MID CT Connected Polyphase Electronic meter with Pulse and Import/Export (UK504-041)

The RJ11 socket provides optional RS communications allowing remote access to the same data as the optical port. It measures elser kWh and kvarh electricity and can monitor single-phase and three-phase networks whilst load profiling helps data collection and analysis.

After 3pm, please arrange with our staff before selecting a priority delivery service. Elster Metering Systems holds on record the appropriate Declaration of Conformity and supporting documentation, against which the CE mark is affixed. Opening folders In the Scheme Manager, double click the leftmost mouse button on Schemes. Meter Information Editor Enter the connection method and any outstation no.

An example of a switching program is below. IP53 to IEC After a short time the screen opposite is displayed. Please Sign in or Create an account to post a question. RS Multi-drop Mode I have an Integra Ri3 energy monitor rather than a smart meter http: The features available will depend on the meter variant See Section 5. Repeat for kvarh using left hand Test LED.

Load profiling — The A can be set to observe daylight elsyer See 3. This is achieved by copying a Meter and a Scheme into the Meter list.