KANTECH KT 300 PDF

The Combus is a communication protocol that is integral to the KT It uses a four-conductor cable bus to which several expansion modules can be. Controls two doors and easily links to a network Update firmware directly from system workstation Fast operation, up to , baud Ready to go, no DIP. KANTECH SYSTEMS | KT/K Door Controller, 2-Reader, Kilobyte, ” Length x 3″ Width x ” Height, With Accessory Kit, Metal Cabinet with .

Author: Murg Magor
Country: Kazakhstan
Language: English (Spanish)
Genre: Love
Published (Last): 2 August 2005
Pages: 176
PDF File Size: 9.91 Mb
ePub File Size: 13.21 Mb
ISBN: 131-6-19538-824-7
Downloads: 89515
Price: Free* [*Free Regsitration Required]
Uploader: Dotaxe

Backup battery provides operation of up to 12 hours but has been tested only 4 hours per Section 33 of UL, fifth edition. Do not connect the power until all wiring is completed. Page 6 Kantech must first obtain an authorization number.

Controllers are linked together through their RS connectors. It does not seem to be communicating with the software. Preferably, it should be placed at a convenient distance from the connected devices. Connect the battery leads to the battery, and connect the AC transformer. My suggestion is to call in a company to deal with this. Then, connect the AC transformer. Already have an account? Locking devices are also supervised for short and open circuits.

I am having issues with it. Don’t know if you resolved this but hopefully you figured to give Kantech a call. Power outputs are supervised and individually protected against short-circuits and surges by self-resetting PTC. Stand-alone mode protects against power or system failures and the system stores cardholder and event data, which is automatically transmitted back to the EntraPass system once the network connection is restored. A set fee which Kantech has pre- determined and which may be revised from time to time will be charged for each unit repaired.

  HANUMAT KAVACHAM PDF

KANTECH KT INSTALLATION MANUAL Pdf Download.

Does anyone have any ideas? Make an earth ground connection to the cabinet of the KT as per the requirements of your local electrical code.

Register a new account. It uses a four-conductor cable bus to which several expansion modules can be connected. By continue to navigate through this site or by clicking Approve, kajtech consent to the use of cookies on your device as described in our Privacy Notice. The status that is seen says controller or module not assigned. By pressing ‘print’ button you will print only current page.

Availability varies by region and may require certification; please verify conditions with your Regional Sales Manager. KT Door Controller The KT door controller supports up to two readers, which can be installed either on a single door to monitor both entry and exit or on two separate doors.

All circuits are power limited. Connect the external tamper switch, if used.

Kantech Kt-300 2 Door Controller 128kb Memory Metal Cabinet

After all wiring is completed, apply power to the KT If the KT loses communication with the module, it will initiate a module reset and will power down the Combus for five seconds in an attempt to reset the problem module. There are liability issues relating to access control such as Fire code kantecu. Kt Compliance Specifications Backup battery provides operation of up to 12 hours but has been tested only 4 hours per Section 33 of UL, fifth edition.

  BUJINKAN TAIJUTSU PDF

Products which Kantech determines to be repairable will be repaired and returned. Table of Contents Add to my manuals Add.

The KT was communicating via the RS port and you installed a VC to communicate via the RS port; c You were using the KT at a local site and now want to configure it for remote operation. Can be expanded up to 16 controlled outputs when using a KT-PC module. Their tech support is extremely helpful. In the event of a power surge or transient, a module may lock up and cease to communicate with the controller.

Kantech KT-300 Installation Manual

At first when i set it up all the LED did on the panel was flash. Got it, continue to print.

Sign In Sign Up.